FRAMING QUANTITIES — 1 Bed Type A (12.5 × 4.8 = 60 m²)

Skillion 3° · front high 2650 / back low 2400 · take-off to stock lengths 4.8 / 5.4 / 6.0 m · preliminary — confirm against engineer's framing & connection design

Framing system assumed (AS 1684.2, wind N2): wall framing 90×35 MGP10 H2 studs @ 600 c/c — external walls bottom + double top plate, internal walls bottom + single top plate, 1 noggin row each · rafters 300×45 LVL @ 600 c/c (full 4.8 span + eaves; 300 depth fits R6.0 ceiling batt) · lintels 140×45 over all openings (140×45 treated pine — engineer confirms wide openings) · roof battens 70×35 @ 900 (or top-hat) · side eaves on 140×45 outriggers @ 900 · fascia 190×30 (or metal) · every opening framed with doubled jamb studs + jack/trimmers + head cripples (sill trimmer + cripples to W5).
Walls: external ≈ 34.6 m (front 12.5 + back 12.5 + 2 ends 4.8) · internal ≈ 17.8 m (bed|area 4.8, robe 3.6, dividing 4.8, laundry back 1.44, nib 0.86, corridor 0.96, 2 linen nibs 1.3).
Suspended timber floor: 19 mm yellow-tongue Structaflor on 140×45 H3 joists @450 hung off bearers (joist hangers, flush bottoms) on 2/140×45 H3 bearers on stumps @ ~1.8×2.4 grid · 450 clear to underside of frame → FFL ≈ 614 AGL (engineer confirms spans/stumps/footings to soil class).
Flooring options (costing): the floor can be built two ways — 1 · this timber subfloor (posts + Structafloor, take-off above), or 2 · a concrete slab-on-ground (costed separately). Pick Timber vs Slab on the landing page and the estimate swaps the cost accordingly.
Cladding: Scyon Axon 16 mm (James Hardie) on cavity battens over a vapour-permeable reflective wall wrap. Insulation (Zone 7): ceiling R6.0, walls R2.5 + wrap, floor R2.5; double glazing — see insulation table below.
MemberSize / gradeUseQtyStockLineal m
SUBFLOOR / FLOOR — suspended timber (450 clear underfloor)
Floor joists140×45 H3@450, single span 2400, hung off bearers (joist hangers); 4.8 m = 2 segments284.8 m134
Bearers2/140×45 H33 lines × 12.5 (built-up), on stumps @1.8136.0 m78
Joist hangersgalv (140 mm)2 per joist segment (≈4 per joist line × 28)112ea
Stumps + ant capsgalv adjustable (or 100×100 H5)≈1.8 × 2.4 grid, 450 clear, on concrete pad footings24ea
Flooring19 mm yellow-tongue Structaflor3600×900 sheets, glued + screwed, joists ≤45020sheet65 m²
EXTERNAL WALL FRAMING — 90×35 MGP10 H2
Studs — front wall90×35front (high) @600, 2650 h (2 / length)155.4 m81
Studs — back wall90×35back (low) @600, 2400 h (2 / length)124.8 m58
Studs — end walls90×35raked ends @600, ~2500 h (2 / length)105.4 m54
Plates90×35 (btm H2/H3)1 bottom + 2 top × 34.6 m186.0 m108
Noggings90×351 row × 34.6 m66.0 m36
Opening framing90×35doubled jamb studs + jack/trimmers + head cripples × 6 openings (W1–W4, slider, W5 incl sill trimmer + cripples)154.8 m72
INTERNAL WALL FRAMING — 90×35 MGP10
Studs — internal90×35all internal walls @600, 2400 h + door jambs (2 / length)194.8 m91
Plates90×35 (btm H2/H3)1 bottom + 1 top × 17.8 m66.0 m36
Noggings90×351 row × 17.8 m36.0 m18
Opening framing90×35doubled jamb studs + jack/trimmers + head cripples × 3 internal doors/openings54.8 m24
ROOF FRAMING
Rafters300×45 LVL E13@600, 5.85 m ea (4.8 span + 0.6/0.45 eaves); 300 fits R6.0 ceiling + vent gap226.0 m132
Outriggers140×45 MGP10side eaves @900, cantilevered (≈6 / length)26.0 m12
Roof battens70×35 (or top-hat)@900, 7 rows × 13.4 m (incl side eaves)166.0 m94
Ceiling battens70×35 H2 (blue pine)@450 c/c across rafters (for 10 mm ceiling); ~11 rows × 12.5 m246.0 m140
LINTELS & TRIM
Lintels140×45 treated pineover all openings (W1–W5, slider, doors) — 2 / length64.8 m29
Fascia190×30 (or metal)eave perimeter ≈ 36.7 m76.0 m42
TOTAL TIMBER (lineal m, ex-waste — excl. flooring sheets & stumps)1239

Bracing, tie-down & connector hardware (Pryda)

ItemProduct / codeUse & fixingQty
ROOF — bracing & rafter tie-down
Rafter tie-downPryda UniTie 170×32 — RH (p1073042) + LHrafter → top plate, one each face of every rafter (N2 uplift); 4 OSNG nails each leg44 (22 RH + 22 LH)
Roof bracingPryda Strap Brace 32×1.2mm × 30 mtension strap — diagonal opposing pairs each end, over rafters @30–45° to plate, ends strained & wrapped to side + under top plate (AS4440); ≈27 lm (2 × 30 m rolls)2
Connector nailsPryda Timber Connector Nails 35×3.15 galv (OSNG)fix ALL Pryda ties & bracing — 2/rafter crossing (Strap Brace), 4/leg (UniTie); hand-driven, ≥10 mm from edges (≈3 kg used)1 × 5 kg
SUBFLOOR — connectors (also listed in floor take-off above)
Joist hangersgalv to suit 140×45 (Pryda)2 per joist segment, hung off bearers — fix with OSNG nails112
Stump stirrups + ant capsgalv adjustable (Pryda/Dunnings)on concrete pad footings, ≈1.8 × 2.4 grid, 450 clear24
WALL bracing & frame tie-down — by structural engineer
Wall bracing unitsPryda Strap Brace 30×1.0mm × 30 m (Type A)Type A wall bracing per AS1684 §8 (N2) — engineer to confirm count/layout2
Frame tie-downPryda Stud Tie 400×25mm Double-Sided Pre-Bent (for 90mm timber)wall-to-floor & top-plate uplift continuity (N2) — engineer to confirm50

Quantities indicative to the roof detail drawings (rafter ≈ 22 @ 600 c/c). All Pryda connectors fixed with Pryda Timber Connector Nails 35×3.15 galv (OSNG) — approved machine-driven nails (Paslode/Duo-Fast 32×2.5 SHEG) may substitute with +1 nail per connection; S316 stainless (OSNBCI/SS) where exposed. Confirm connector types, grades, counts & nailing against the engineer-certified design for the confirmed wind class.

Order summary — pieces by size & stock length

Size / grade4.8 m5.4 m6.0 m
140×45 H3 (floor joists)28
140×45 H3 (bearers, doubled)13
90×35 MGP10 H2 (wall framing)512533
300×45 LVL (rafters)22
140×45 (lintels treated pine + outriggers MGP10)62
70×35 batten (roof @900 + ceiling @450)40
190×30 fascia7

Insulation, sarking & cladding (Climate Zone 7 — by area)

ItemSpecArea / qty
Ceiling insulationEarthwool R6.0 batt (raked, between 300 rafters + 25 vent gap)~60 m²
Wall insulationEarthwool R2.5HD SoundShield batt (90 frame)~68 m²
Floor insulationPink Batts R2.5 HD floor batt (between joists)~60 m²
Wall wrap / sarkingvapour-permeable reflective (behind Axon) + laps~90 m²
Roof sarkingAmetalin SilverSark HD reflective anti-con (under Trimdek) + laps~85 m²
External claddingScyon Axon 16 mm (James Hardie) over cavity~87 m² (cladding trade)
Cavity battens35×35 H3, vertical over studs @600~150 m (25 × 6.0)
Glazingdouble-glazed low-E (Zone 7)per window schedule

Achieves Zone 7 DTS Total-R (ceiling R6.0 · wall ~R2.8 with reflective wrap + cavity · floor ~R2.75–3.0). Vapour-permeable membranes per NCC 2022 condensation provisions (cool zone). NatHERS 7-star assessment confirms the EER. R6.0 ceiling fits the 300×45 rafters + 25 mm vent gap (raked skillion).

Notes / exclusions. Wall framing = 90×35 MGP10 (90×25 is not a structural framing size). Bottom plates H2/H3 treated. Add ~10% waste for cutting. Roof bracing & rafter tie-down hardware is now scheduled above (Pryda Strap Brace/UniTie to AS4440/AS1684) — indicative; wall bracing units & frame tie-down continuity remain by the structural engineer for the certified wind class. Excludes: general nails/screws/bolts (other than the Pryda connector nails nominated above), roof sheeting/flashings, gutters, plasterboard, joinery, footing concrete (suspended floor — no slab). Opening framing (doubled jambs, jacks, sill trimmers, cripples) is itemised separately — confirm exact counts against the engineer's frame layout. Final sizes & spacings per the engineer-certified drawings.